%=====CME434 Fall 06: HW7 assigned on 11/02/06 is due on 11/15/06 %22. Add preprocessing to HW6 Script to recognize transverse concentrated loads and full length uniform loads applied to members between the joints and transform them to loads at the joints for analysis. Solve the portal frame given in hw70data.txt, the bridge truss given in hw71data.txt, and the cable stayed bridge given in hw72data.txt. %Additional for Graduate Students: also preprocess transverse loads on members with releases to model FF, FP, PF and PP members. Solve the building frame in hw73data.txt