| Tigger down Sat AM 9-12 | ||
|
Nov 27 2004 - Tigger is down from 9AM-12Noon on Saturday Nov 27 for softwar maintenance. |
||
| Webmail Login Improvement | ||
|
Nov 19 2004
- We made a small tweak to the webmail login page.
You no longer have to click on the netid box to begin
entering your netid. |
||
| ACCC/Client Services Office Hiring for Spring, 2005 | ||
|
Nov 17 2004
- The Client Services Office, ACCC, is hiring student employees for
Spring, 2005. Find all the details, including dates, deadlines
and the mandatory technical test sign-up form at:
http://www.uic.edu/depts/accc/cso/employment/
|
||
| tigger down Friday night, 9pm-10:30pm | ||
|
Nov 12 2004
- FYI |
||
| tigger having hardware problems | ||
|
Nov 10 2004 - tigger is having hardware problems. It is still up, but will continue to have intermittent problems. We have a call into our service provider for parts. We do not have an estimate at this time as to when tigger will be back up. |
||
| tigger bad power supply and bad software patch fixed | ||
|
Nov 10 2004 - tigger was down several times Wednesday Nov. 10 between 9:15 and 16:00. The instability was caused by 2 problems: a broken power supply, and a bad software patch. The broken power supply was replaced. For several months we have been experiencing a problem which would occasionally cause corruption of a file system when the system was heavily loaded and we were waiting for IBM to resolve the problem. Recently, a patch to address this problem was made available and last night we installed it. Now it appears that the patch caused the filesystem to become unusable so we backed-out of the installation of the patch. We expect tigger to be stable again. |
||
| tigger is continuing to have intermittent problems | ||
|
Nov 10 2004 - We are still experiencing intermittent problems with tigger. We do not have an estimate at this time as to when the problem will be fixed. |
||
| tigger down Tue Nov 9 11PM-1AM | ||
|
Nov 09 2004 - tigger will be down from 11PM until 1AM Tonight (Tuesday November 9) to apply software patches which we hope will correct the cause of the two crashes we've had in the past two days, and also correct the problem we had getting the mail spool back online after this morning's crash. |
||
| mail delays to ECE, CS, EVL | ||
|
Nov 05 2004
- We found and fixed a problem that caused some email to be delayed
to ECE, CS, and EVL. Some of the mail was delayed for
a few days, so if you're affected, you will get the backlog all at once now. |
||
| Blackboard Outage | ||
|
Nov 04 2004 - Blackboard was down Thursday, November 4, from around 10:30 to 14:30 and it is now working normally. We are working with the vendor to diagnose the problem but we think some contributing factors are: an unexpected restart of the database triggered accidentally by work done on another project; permissions set incorrectly on a log file but not detected until today's restart; and possible misconfiguration of the activity accumulator within the blackboard system. |
||
| Argo - downtime on Monday, Nov. 1. | ||
|
Nov 01 2004 - The master machine in the argo system will be down for several hours starting at 10:00 AM on Monday, November 1. Argo account holders will not be able to login during the outage. In addition, user of ANSYS on UIC-based PCs will not be able to run the software because argo is the license server. The purpose of the downtime is to upgrade the OS on the master machine. |
||
| JGS |
|