| ACADEMIC COMPUTING and COMMUNICATIONS CENTER | |||||||||
News - Jan 2003 | ||
| ||
| Tigger down Saturday 6am-8am | ||
|
Jan 31 2003 - Tigger will be down from 6am until 8am tomorrow morning (Saturday, Feb 1st) from 6am until 8am. We will be replacing the battery the powers non-volatile ram. |
||
| SQL virus update | ||
|
Jan 26 2003 - By now you probably have all heard about this on the news so I won't go into details. It started around 11PM Friday. We have been shutting down infected internal vlans as needed to keep the rest of the net operational. We continue to monitor the situation. There are still some attacks coming in from our external links, genuity, ICN, I-2, UIUC to name a few. We expect this to continue through Monday but we can live with it for now... Most of the on-campus problems have been isolated. The Internet is fully reachable but slightly slower in some cases. We are still being hit with a constant 69Mb stream from UIUC. Hopefully they can resolve this before Monday morning when the core apps fire up. The following ports were shutdown yesterday. Some are entire networks, others are smaller chunks of networks. They will remain down until the infected SQL servers are patched or pulled from the net. >>>>vlan 177 port 4/13 part of 131.193.177.0 ccsel.networks.uic.edu ------------------------------------------------------------- >>>>vlan 208 port 4/7 cba in uh 131.193.209.0 and 208.0 ------------------------------------------------------------- >>>>vlan 32 CS 131.193.32.0 port 5/7 >>>>vlan43 (ECE/CE) 131.193.43.0 ports 5/8 >>>>vlan141 SSB ports 5/2-3 131.193.138,139,140 ------------------------------------------------------------- >>>>vlan 379 -dent port 2/4 128.248.79.0/97.0 ------------------------------------------------------------ >>>>vlan 355 MSB ports 4/7 & 6/5 128.248.55.0 ------------------------------------------------------------- >>>>vlan 391 ports 2/21-22 128.248.91.0 anatomy |
||
| Tigger downtime Saturday morning 6AM-10AM | ||
|
Jan 25 2003 - Tigger, our faculty/staff email and personal web page server, will be down Saturday morning (1/25) from 6am until 10am. We will be installing additional memory which should help performance. Most www.uic.edu web pages will not be affected during the upgrade. |
||
| Network Problems Saturday AM | ||
|
Jan 25 2003 - Network attacks from off campus and from on campus are adversely affecting UIC's connectivity. These attacks are causing trouble nation-wide according to postings on CNN and other news sites. View the CNN article ACCC is working at this time to alleviate the problems to the extent possible. |
||
| Icarus down Monday night 10am-2am | ||
|
Jan 20 2003 - Icarus will be down tonight from 10am until 2am so that we can repair a problem with the disk quota system. |
||
| ICN outage | ||
|
Jan 14 2003 - At about 10:00 AM, we observed that the ICN link went down. Operations staff contacted ICN and found they were having troubles at the NAP. Service was restored at 11:41 AM. Jack Gallagher UIC ACCC Networking |
||
| Icarus upgrade completed | ||
|
Jan 11 2003 - Icarus is now running on a new Sun Microsystems, Inc. "SunFire V880" server with 8 900MHz UltraSparcIV processors and 16GB of RAM. The operating system has been upgraded to Solaris8. If you encounter any difficulties with icarus, please send a DETAILED message to SYSTEMS@UIC.edu or call the network operations help desk at 312-413-8080 extention 2. |
||
| Meetingmaker downtime Saturday 1/11 | ||
|
Jan 11 2003 - As part of the icarus move to new hardware, the ACCC meetingmaker service will also be down on Saturday, January 11. The service will be available again on Sunday. |
||
| WebBoard upgrade, Sat. 1/11 | ||
|
Jan 11 2003 - The ACCC WebBoard server is being upgraded to version 6 and simultaneously being moved to new, much faster, hardware. The server will be unavailable on Saturday, January 11, from 9am CST until 2pm. |
||
| WebBoard upgrade successful | ||
|
Jan 11 2003 - The WebBoard upgrade to version 6 and move to new hardware were completed successfully and ahead of time. Performance is a lot better than before. |
||
| icarus update Saturday 3pm | ||
|
Jan 11 2003 - Things are progressing, but going slower than expected. Right now it looks as if icarus will be up no earlier than 10pm. Sorry for any inconveniences caused. |
||
| icarus update Saturday 3pm | ||
|
Jan 11 2003 - Things are progressing, but going slower than expected. Right now it looks as if icarus will be up no earlier than 10pm. Sorry for any inconveniences caused. |
||
| Icarus to be down Sat. Jan 11 for system upgrade | ||
|
Jan 08 2003 - Icarus, our main student email/web server, will be down for a significant period of time on Saturday January 11th so that we can install a complete hardware and OS upgrade. Icarus will be shut down at 12:01am Saturday morning. If the upgrade goes very well, it may be back in production as early as 2pm, but complications could extend the downtime further into Saturday evening and/or night. We'll try to post updates here of any change in status. The new hardware, a SunFire V880 from Sun Microsystems, will be twice as powerful as the current icarus (Sun E4000) and should provide significant improvements in response time. We will also be upgrading the Solaris operating system from version 2.7 to Solaris8 (2.8). This Solaris upgrade is required to support the new hardware. We're sorry for inconveniences caused by the upgrade, but we expect that the result (a faster and more stable system) should be worth the wait. |
||
| ADSM Upgrade Complete | ||
|
Jan 01 2003
- The ADSM/Tivoli Storage Manager Server has now been converted to its new
home - a much faster RS/6000 H80. It is now running in production mode,
catching up with delayed backups. |
||
| JGS |
|